Santa Monica City Council approved a proposal to cap an additional portion of the 10 freeway on Tuesday. This second cap park would be over the freeway slot between Ocean Ave and 4th St. The decision comes just months after another park was approved over the Santa Monica Freeway between 14th and 17th Sts. But that project is still in early feasibility stages. This latest development brings the number of LA area freeway cap parks under consideration to 4 - the others over the 101 in Hollywood and Downtown.
City leaders hope a park bridge over this section of the freeway would help create a stronger pedestrian connection between the Third Street shopping area, the pier, and the newly revitalizing civic center. The freeway segment is already conveniently "cut" about 20 ft below ground, but is still exposed to the open air. At Ocean Ave, the freeway briefly tunnels below Ocean Park and the entrance to the pier, before emerging again as the Pacific Coast Highway along the beach. By extending the tunneled portion of the freeway, both parks might also benefit from larger green spaces and greater pedestrian access. The park would also be convenient to the Expo light rail station planned for Colorado Ave and 4th St.
The approval allows spending of ~$300,000 for a feasibility study and ~$3m for initial engineering. Local planning and engineering firm AECOM is charged with conducting the preliminary study and will present its findings to the council within 3 months. The park has been a pipe dream of the city's since at least 1999.
The added land, which is in the super-prime center of Santa Monica, would be more valuable than the cost of capping the freeway. Besides the obvious mitigation of the visual and aural impacts of the freeway, and the shifting of transportation priority from freeways to public transit, projects like this are significant case studies in the frontier of "land creation." As suburban sprawl has lost its appeal in the aftermath of recent economic and environmental events, developers are looking to disprove the old adage 'you can't build more land.' Freeways occupy huge expanses of our built environment, often in inefficient ways. Where freeways have been dug below ground, or where they pass through expensive land, there can be innumerable benefits from capping or reclaiming that ugly and wasteful infrastructure. Santa Monica's experiments should be watched closely by civic leaders and developers everywhere.
Source: Santa Monica Daily Press
Thursday, January 21, 2010
Santa Monica plans second freeway cap park
Saturday, April 4, 2009
Metro Board Chooses Right-of-Way Option in Expo Phase II
5:35 PM | 10 freeway, Cheviot Hills, Colorado Ave, Culver City, Expo light rail, grade separation, Santa Monica, Sepulveda Blvd, Venice Blvd
The Metro and Expo authority boards voted unanimously last week in favor of the Metro-owned Exposition right-of-way route for the second phase of the Expo light rail connecting downtown Los Angeles to Santa Monica. That route follows the rail line that was used by the Pacific Electric red car system that was eradicated in the 1950s. The option is cheaper, faster, more convenient, and would attract higher ridership than the alternative.Opposition to this route came from residents of the Cheviot Hills area directly to the north of the Exposition right-of-way. That neighborhood is composed predominantly of upscale, single-family homes. Residents have voiced concerns that the light-rail line would be noisy, ugly, and would bring urban blight to the plush region. They tried in vain to convince the board that a route traveling westward on Venice Blvd and then turning northward up Sepulveda Blvd would attract more riders.
First Century City, then the 10 freeway and now this? Cheviot Hills just can't seem to keep the big, bad city from closing in around it.
Saturday, March 28, 2009
Weary of the 10, Santa Monica Proposes to Bury Freeway Under Park
The City of Santa Monica last week authorized a petition of $250,000 to the state for the feasibility study of covering I-10 between 14th and 17th streets with a park. The intention of the move is to add more green space to the city, mitigate the presence of the freeway, and bridge some of the neighborhood rifts created by the introduction of the freeway in 1964. The section of freeway in question is bounded by Memorial Park, a small municipal park, to the north, and the Woodlawn Cemetery to the south.
New freeway construction was extremely controversial in the US in the middle half of the last century, as it replaced gigantic swaths of homes and sometimes entire neighborhoods. But the US Interstate system was relentless in its goal of linking the nation's cities. Support for the futuristic network of roads was often even enthusiastic, especially during wartime. But the City of Santa Monica has long resented the presence of the freeway in its city limits - it brings high-speed outsiders to the upscale beachside community.
Sooner or later the city has to realize that, despite its 90,000, it sits at the core of the nation's second biggest metro area. The freeway is an important connector of the city's business district and Pac Coast Hwy with central LA and the rest of Southern California. But anyway, hiding the freeway under a park isn't a bad idea. It will create a large contiguous greenspace with its approx. 7 added acres. It will create a "land bridge" that will be much more pleasant for pedestrians to cross than a typical overpass. And it will begin to break up the dominating repetitiveness of the "grayscape." But it might be expensive. The City of Los Angeles has determined the cost of a similar park over the 101 in Hollywood to be around $1 billion.
Friday, March 6, 2009
Mixed Decisions on Expo Lightrail Crossings
1:17 PM | 10 freeway, Culver City, Downtown, Expo light rail, Exposition Blvd, grade separation, Jefferson Blvd, South LA, Westside
California Public Utilities Commissioner Rachelle Chong ruled last week on a pair of controversial street crossings for the Expo light rail, under construction between Downtown and Culver City. Her decision allows for an at-grade crossing to be built at Harvard Boulevard, but rejects the Expo Metro Line Construction Authority's request for the at-grade crossing at Farmdale Avenue. The majority of the line's 38 crossings have been approved, but these last two were met with strong opposition from community members who feared for the safety of the students at local high schools.
'Fix the Expo Rail Line' is the community organization created to protest the seemingly dangerous light rail-street crossings near Dorsey High School (Farmdale Avenue) and the Foshay Learning Center (Harvard Boulevard), in South LA. This decision marks a half-victory for that team, as only one of the two crossings was denied. Grade separation is the act by which the right-of-way for the light rail is either dug below street level into a trench or raised above the street on an elevated rail. Both methods of grade separation are prohibitively expensive, and the Metro construction authority has pleaded that they simply cannot afford the changes, and that they will delay the project indefinitely.
Already included in Metro's plan were two above-grade stations (La Brea and La Cienega) and one short underground passage (corner of Jefferson Blvd. and Flower St.), both implemented because of heavy automobile traffic in those areas. They were built into the initial construction budget and planned for. While it is encouraging to learn that the voice of the community is not mute in this project, the delay of the already too-late rail line to the Westside will be unpleasant to builders, financiers, riders, and neighbors. The slow-moving light rail trains will arguably pose little additional threat to the existing dangers of high-speed local boulevards Exposition and Jefferson. And while protesters have made it clear they want to "fix" the line, rather than oppose its implementation, the transit linkage of Downtown with West LA will be a net gain for residents of those nearby areas. All you have to do is look at the traffic on the 10 anytime between 6 am and 9 pm to understand the desperate urgency of this project.
